Yarra River Closures & Waterway Alerts
From time to time, sections of the Yarra River may be closed or restricted due to major events, construction works, or other waterway activities. These closures are managed by external authorities and are outside of our control.
Additionally, weather conditions such as heavy rain or strong winds may impact river access or the safe operation of our self-drive hire boats.
We recommend checking this page regularly for updates on any upcoming river closures or navigation notices that may affect your booking. Our team may also notify affected customers where possible.
Thank you for your understanding as we prioritise your safety and compliance with maritime regulations.
EVENT CLOSURES
Date | Time | Details | River Status | Location |
---|---|---|---|---|
Saturday 14 June 2025 | 08:00 – 10:30 | Rowing Victoria – John Whiting “Round the Island” | Closed | Yarra River – Upstream end of VRA landing to Herring Island |
Saturday 21 June 2025 | 09:00 – 10:30 | Rowing Victoria – Winter Sculling Series, Round 1 | Open | Yarra River – VRA Judge’s box to Cremorne Railway Bridge |
Saturday 28 June 2025 | 09:00 – 10:30 | Rowing Victoria – Winter Sculling Series, Round 2 | Open | Yarra River – VRA Judge’s box to Cremorne Railway Bridge |
Saturday 5 July 2025 | 09:00 – 10:30 | Rowing Victoria – Winter Sculling Series, Round 3 | Open | Yarra River – VRA Judge’s box to Cremorne Railway Bridge |
Saturday 12 July 2025 | 09:00 – 10:30 | Rowing Victoria – Winter Sculling Series, Round 4 | Open | Yarra River – VRA Judge’s box to Cremorne Railway Bridge |
Saturday 19 July 2025 | 09:00 – 10:30 | Rowing Victoria – Winter Sculling Series, Round 5 | Open | Yarra River – VRA Judge’s box to Cremorne Railway Bridge |
Saturday 26 July 2025 | 09:00 – 10:30 | Rowing Victoria – Winter Sculling Series, Round 6 | Open | Yarra River – VRA Judge’s box to Cremorne Railway Bridge |
Saturday 16 August 2025 | 07:30 – 10:30 | Rowing Victoria – Scullers Head of the Yarra | Closed | Closed Yarra River – VRA landing to the upper side of Hawthorn Bridge |
Saturday 15 November 2025 | 07:30 – 17:30 | Melbourne Head Regatta | Closed | Yarra River – Upper end of VRA landing to Powerhouse Landing |
RIVER WORKS
Date | Time | Details | River Status | Location |
---|---|---|---|---|
25 March 2024 –20 June 2025 | All hours | Princes Bridge renewal works – Stage 2ils | Partially closed Status | Partial closure of Southern arch – reduced clearance and channel width. Signage is in place |
20 October – 22 October 2025 | 06:00 – 18:00 | North Wharf southern side inspections and make safe works | Open | Yarra River – No exclusion zone in place. Dive operations will be occurring intermittently during works period, watch for displayed Alpha Dive Flag |
11 April 2025 – 19 December 2025 | All hours | Greenline boardwalk construction, Birrarung Marr | Partially closed | Exclusion zone in place. Buoyage set up to 30m from the Northern bank in three areas between Federation Wharf and the Swan Street Bridge. |
TBC (April/May 2025) | Dredging – Collins Landing & Australia Wharf | Open | Yarra River – Waters adjacent to Collins Landing & Australia Wharf, upstream of Bolte Bridge | |
5 September 2023 – 29 May 2026 | All hours | Central Pier demolition | Open | Victoria Harbour, Yarra River – Exclusion zones in place |